Sherriff Station ​

Project Information

Total Area Per Site

30, 000 sq. ft ​

Location

Norwalk, California, USA​

Project Duration

2.0 Weeks​

Software Used

Revit. Energy Pro, Visual​

Scope of Work

Mechanical, Electrical & Plumbing​

With MVN’s expertise in system integration, this sheriff station project was equipped with solutions tailored to support both administrative functions and public service operations. The design emphasized efficiency, compliance, and adaptability to future needs, ensuring reliable performance and a safe, comfortable environment for staff and visitors.


Mechanical Design

The facility was served through a VRF system, providing efficient heating and cooling with zoned control to maintain comfort across offices, holding areas, and public spaces. Mechanical routing was coordinated with architectural layouts to ensure seamless integration and long-term maintainability.


Electrical Design

Electrical infrastructure was upgraded with new lighting and receptacles to enhance safety, functionality, and energy efficiency. Photometric analysis guided illumination for offices, corridors, and secure areas, while receptacle distribution supported technology, equipment, and daily operations with a durable and adaptable backbone.


Plumbing Design

Plumbing systems were modernized with new restroom installations, designed to meet code requirements and improve accessibility and durability. Routing was coordinated to ensure efficient water distribution, waste removal, and long-term reliability for staff and public use.

Send Us mail

Let’s start a conversation. Reach out to discuss how MVN Engineering Services can support your next engineering challenge.

Have a Project in Mind?
Let’s Bring It to Life