With MVN’s expertise in system integration, this sheriff station project was equipped with solutions tailored to support both administrative functions and public service operations. The design emphasized efficiency, compliance, and adaptability to future needs, ensuring reliable performance and a safe, comfortable environment for staff and visitors.
Mechanical Design
The facility was served through a VRF system, providing efficient heating and cooling with zoned control to maintain comfort across offices, holding areas, and public spaces. Mechanical routing was coordinated with architectural layouts to ensure seamless integration and long-term maintainability.
Electrical Design
Electrical infrastructure was upgraded with new lighting and receptacles to enhance safety, functionality, and energy efficiency. Photometric analysis guided illumination for offices, corridors, and secure areas, while receptacle distribution supported technology, equipment, and daily operations with a durable and adaptable backbone.
Plumbing Design
Plumbing systems were modernized with new restroom installations, designed to meet code requirements and improve accessibility and durability. Routing was coordinated to ensure efficient water distribution, waste removal, and long-term reliability for staff and public use.

