MVN’s commitment to performance-driven design is reflected in this 5,000 SF office tenant improvement project, where mechanical, plumbing, and electrical systems were carefully integrated to elevate workplace comfort, efficiency, and reliability. The result is a modern environment that supports daily operations, collaborative workspaces, and long-term sustainability while meeting stringent acoustic and functional criteria


Mechanical Design

The mechanical system was designed to balance occupant comfort with critical noise control requirements. A rooftop unit was installed to serve the office space, with circular silencers incorporated into the ductwork to ensure compliance with strict noise criteria. This approach provides consistent airflow distribution while maintaining a quiet and productive work environment.


Electrical Design

The electrical design introduced new lighting and power systems to support both general office use and collaborative technologies. Energy-efficient lighting fixtures were selected and arranged to optimize illumination, while new outlets and circuits were strategically distributed to accommodate workstations, meeting areas, and IT equipment. Code-compliant controls ensure flexible operation and long-term reliability


Plumbing Design

The plumbing scope focused on the remodel of existing restrooms to meet updated code requirements and enhance user convenience. Fixtures and piping layouts were reconfigured for efficiency, with attention to accessibility and water-saving compliance standards.