Healthcare Tenant Improvement ​

With MVN’s expertise in system integration, this healthcare tenant improvement project was designed to support a variety of specialized clinical spaces, including exam rooms, treadmill testing areas, laboratory spaces, colocation areas, and dedicated Endocrinology and Rheumatology exam rooms. The design emphasized efficiency, comfort, and compliance while ensuring the facility can adapt to evolving healthcare needs.

Mechanical Design

The mechanical design utilized a water-source heat pump system to provide efficient heating and cooling across all clinical and support spaces. Acoustic performance was a key consideration due to the sensitivity of exam and testing areas, requiring careful treatment and equipment selection. Limited ceiling space made system coordination critical, ensuring ductwork, piping, and utilities were integrated without compromising functionality or accessibility.

Electrical Design

Electrical upgrades included new lighting designed with photometric analysis to achieve proper illumination levels for clinical tasks and patient comfort. New receptacles were distributed throughout the space to support staff work areas, diagnostic equipment, and general power needs. Dedicated power was provided for medical equipment to ensure reliability and compliance with healthcare electrical standards.

The mechanical systems were tailored to the building’s mixed‑use operations. Key design elements include:

  • First‑floor kitchen exhaust terminated with a wall‑mounted blast fan, supported by a makeup air unit located outside the building.
  • First‑floor retail space served by a fan coil unit paired with a gas‑fired furnace.
  • Second‑floor retail tenant similarly equipped with a dedicated fan coil and furnace system.
  • Each dwelling unit on upper levels provided with its own fan coil unit for independent comfort control.
  • Condensing units strategically located at grade level outside the building for efficient operation and service accessibility.

Electrical systems were designed to meet the varied needs of restaurant, retail, and residential spaces. Key highlights:

  • Existing services leveraged with new panels provided as required to support tenant improvements.
  • Kitchen areas on the first level equipped with GFI outlets for safety compliance.
  • Retail and dwelling units fitted with outlets in full compliance with code.
  • Lighting design incorporated aesthetic round fixtures, coordinated with the architect’s reflected ceiling plan (RCP).
  • Lighting ensures both functionality and visual appeal across all restaurant, retail, and residential spaces.

Project Details

Total Area Per Site

20,000 sq. ft​

Location

Thousand Oaks, California, USA​

Duration

1.5 Weeks​

Software

Revit. Energy Pro, AGI 32​

Scope of Work

Mechanical, Electrical

Tell us about your project

We’ll review your requirements and respond within 24 hours.

By submitting, you agree to our Privacy Policy. We never share your data.