We’re Heading to Las Vegas!

Meet MVN Engineering at Two Major Industry Events

MVN Engineering is excited to be part of two of the biggest HVAC and building industry events in the USA.

2026 ASHRAE Winter Conference

AHR Expo Vegas 2026

January 31 – February 4, 2026

Las Vegas, Nevada

Edit Content

Healthcare Tenant Improvement ​

Project Information

Total Area Per Site

6,000 sq. ft​

Location

Thousand Oaks, California, USA​

Project Duration

1.5 Weeks​

Software Used

Revit. Energy Pro, AGI 32​

Scope of Work

Mechanical, Electrical and Plumbing​
Send Us mail

Let’s start a conversation. Reach out to discuss how MVN Engineering Services can support your next engineering challenge.


    Send Us mail

    Orritech offers a range of Technology services for all firms all over the industry


      With MVN’s system integration expertise, this 6,000 SF healthcare tenant improvement project was designed to support clinical and administrative functions while meeting performance, comfort, and compliance requirements. The approach prioritized efficiency, reliability, and effective use of existing infrastructure, ensuring the facility can adapt to future healthcare needs.


      Mechanical Design

      The mechanical strategy focused on maximizing the use of existing systems to maintain cost efficiency and minimize disruption. The existing air handling unit and main ductwork were retained, with VAV boxes relocated and reused wherever feasible to support the revised floor plan. This approach ensured proper zoning, airflow distribution, and comfort across treatment rooms, offices, and support areas while maintaining system integrity and performance.


      Electrical Design

      Electrical improvements were designed to align with healthcare operational requirements while leveraging existing building services. New lighting was installed throughout the facility to enhance visibility, safety, and energy efficiency in clinical and administrative spaces. Additional receptacles were provided based on the new layout to support medical equipment, staff workstations, and patient care needs, ensuring flexibility and compliance with healthcare electrical standards.


      Plumbing Design

      Plumbing work was limited to a restroom remodel, maintaining the existing restroom location and plumbing configuration while updating fixtures and finishes for improved function and compliance.

      Send Us mail

      Let’s start a conversation. Reach out to discuss how MVN Engineering Services can support your next engineering challenge.


        Send Us mail

        Orritech offers a range of Technology services for all firms all over the industry


          Schedule a Meeting

          Have a Project in Mind?
          Let’s Bring It to Life

          We’re Heading to Las Vegas!

          Meet MVN Engineering at Two Major Industry Events

          MVN Engineering is excited to be part of two of the biggest HVAC and building industry events in the USA.

          2026 ASHRAE Winter Conference

          AHR Expo Vegas 2026

          January 31 – February 4, 2026

          Las Vegas, Nevada