We’re Heading to Las Vegas!

Meet MVN Engineering at Two Major Industry Events

MVN Engineering is excited to be part of two of the biggest HVAC and building industry events in the USA.

2026 ASHRAE Winter Conference

AHR Expo Vegas 2026

January 31 – February 4, 2026

Las Vegas, Nevada

Edit Content

IT Office Tenant Improvement

Project Information

Total Area Per Site

180,000 sq. ft​

Location

San Jose, California, USA​

Project Duration

6.0 Weeks​

Software Used

Revit. Energy Pro, Visual​

Scope of Work

Mechanical and Electrical​
Send Us mail

Let’s start a conversation. Reach out to discuss how MVN Engineering Services can support your next engineering challenge.


    Send Us mail

    Orritech offers a range of Technology services for all firms all over the industry


      MVN’s technical expertise and dedication to performance-driven design, this 180,000 SF, six-story IT office tenant improvement project was equipped with advanced mechanical and electrical systems that elevate functionality into a seamless backbone of workplace comfort, efficiency, and technological resilience. The result is an environment that not only supports high-performance computing operations and collaborative workspaces but also ensures reliability, acoustic control, and long-term sustainability for a modern IT workforce


      Mechanical Design

      The mechanical design balanced occupant comfort with IT equipment cooling needs. Existing duct mains were retained to minimize disruption, with new VAV units integrated for precise zone control. Perimeter zones were equipped with reheat coils, while enclosed offices, conference rooms, and IT support areas included sound-boot assemblies and acoustic treatments for privacy. Common maintenance access and filter replacement were prioritized, and energy compliance was verified to ensure efficiency and sustainability.


      Electrical Design

      The electrical design reused existing panels for efficient power distribution and introduced new lighting systems supported by photometric calculations for normal and emergency conditions. Code-compliant controls provided flexible operation, while new outlets supported IT equipment and collaborative technologies. Dedicated circuits and pathways were added for server rooms, network equipment, and high-density loads, with provisions for UPS systems and redundant feeds to enhance resiliency and ensure a future-ready IT workplace.

      Send Us mail

      Let’s start a conversation. Reach out to discuss how MVN Engineering Services can support your next engineering challenge.


        Send Us mail

        Orritech offers a range of Technology services for all firms all over the industry


          Schedule a Meeting

          Have a Project in Mind?
          Let’s Bring It to Life

          We’re Heading to Las Vegas!

          Meet MVN Engineering at Two Major Industry Events

          MVN Engineering is excited to be part of two of the biggest HVAC and building industry events in the USA.

          2026 ASHRAE Winter Conference

          AHR Expo Vegas 2026

          January 31 – February 4, 2026

          Las Vegas, Nevada